"> Building a house in Senegal from abroad: a 10-point checklist | SN-Building-Pro

Guides

Building a house in Senegal from abroad: a 10-point checklist

November 8, 2026 · 1 min read

Every family abroad has heard the stories: money sent for cement that never arrived, a house stuck at the walls for years, a plot sold twice. Building from far away can go well, but only with the right rules from day one. Here is our checklist.

  1. Secure the land first. Check the paper (titre foncier, bail or délibération) and the real owner at the land registry before paying. Read our land guide.
  2. Start with plans, not with bricks. Approved plans and 3D views avoid costly changes and are needed for the permit.
  3. Get the building permit. It protects your investment and your ability to sell or finance later. See the permit guide.
  4. Ask for a written, detailed quote: materials, quantities, labour, schedule and what is not included.
  5. Sign a contract with a registered company, not a verbal deal with an individual.
  6. Pay in stages tied to finished work: foundations, structure, roof, finishing. Never pay for a stage you have not seen.
  7. Demand regular, dated photos and videos, and live video visits when you ask.
  8. Keep every receipt and a simple budget table: planned versus spent.
  9. Name one trusted representative in Senegal for site visits and signatures, with a proper power of attorney where needed.
  10. Plan for power and water: a solar system and a water tank make the house usable during outages.

This is exactly how we work with clients abroad: one contract, a written budget, staged payments and weekly photo updates. See how it works or ask for a free estimate.

This guide is general information, not legal advice. Rules and fees change: confirm the details for your plot with a notary or the relevant office.

More guides

Planning a building or an electrical project?

Tell us what you need. We reply within two working days with next steps and, where possible, a first estimate.